Ontario Food Terminal Bridge 2.jpg

Accel was involved with the concrete structure work for the expansion of Ontario's largest grocery distribution hub, along with constructing a new distinctive pedestrian bridge link between existing buildings. A new canopy structure drapes over the loading dock area. High architectural concrete walls for the new bridge link features a distinctive barn wood finish, reminiscent of old barn structures. Accel addressed a number of logistical and planning challenges working in the high traffic area while the facility remained in full operation.